Leckonby Hall in Garstang
At Leckonby Hall in Garstang, the client’s requirements were to have a more efficient boiler room and heating system, and to have pressurised hot water on demand.
We redesigned the plant room, with works including –
- Decommissioning and removal of the existing boiler, hot water cylinder and all pipework from the room
- Flushing of all existing pipework and radiators.
- Full ply-lining of all walls and installation of water resistant flooring to make a new, clean and maintainable space.
- Conversion of the heating system from a problematic gravity fed system to a pressurised heating system.
- Installation of 2x 30kw Worcester 800 Series boilers, Worcester low loss header, a 300 Litre pressurised hot water cylinder and pump unit and a large Grundfoss central heating pump.
We will maintain this yearly and the customer has the satisfaction and peace of mind of a 10 year warranty on the boilers.